Pre-Handover (PCI) Inspections in Clyde

Your builder will walk you through and hand you a key. We walk the same house first and write down every item that is unfinished, damaged or outside tolerance, while the contract still gives you leverage.

  • Full room by room defect list
  • Numbered items your builder can work from
  • Photographed and referenced to the tolerance
  • Report back within 24 hours
  • Booked around your handover date
  • Reinspection available before settlement
  • Inspector's mobile number for questions
  • Written for you and the builder
Get your Clyde inspection priceTakes about a minute. No obligation.

Fully licensed & accredited

What is included

What is included in a Clyde pre-handover (PCI) inspection

We measure a Clyde PCI against your building contract and colour selections, the Guide to Standards and Tolerances 2015, the National Construction Code and ABCB Housing Provisions, AS 3740 for wet areas and AS 3700 for masonry.

0 checkpoints across 0 areas on a standard Clyde pre-handover (PCI) inspection. We inspect what can be reached safely on the day. Anything locked, covered or blocked by stored goods is recorded as not inspected rather than passed.

Sample findings

Sample defects found during our pre-handover (PCI) inspections in Clyde

Every item below came out of a Clyde PCI report. The wording is the inspector's, shortened for reading.

Rubber weather seal missing from a section of window, leaving a path for water, found during a pre-handover inspection in Clyde
Rubber weather seal missing from a section of window, leaving a path for water
Finish around the shower water stop angle inconsistent, risking water tracking out, found during a pre-handover inspection in Clyde
Finish around the shower water stop angle inconsistent, risking water tracking out
Excessive gap between window and cladding left unsealed against weather, found during a pre-handover inspection in Clyde
Excessive gap between window and cladding left unsealed against weather
Slab to driveway joint not sealed, letting debris and water under the slab, found during a pre-handover inspection in Clyde
Slab to driveway joint not sealed, letting debris and water under the slab
Debris left in the gutters, blocking roof water from reaching the downpipes, found during a pre-handover inspection in Clyde
Debris left in the gutters, blocking roof water from reaching the downpipes
Sections of eave requiring caulking or filling before handover, found during a pre-handover inspection in Clyde
Sections of eave requiring caulking or filling before handover
Meter box installed out of plumb, noted for the builder to correct, found during a pre-handover inspection in Clyde
Meter box installed out of plumb, noted for the builder to correct
Shower grout joints unsealed, recommended before the wet area is used, found during a pre-handover inspection in Clyde
Shower grout joints unsealed, recommended before the wet area is used
Gaps at wall and ceiling mouldings left uncaulked before painting, found during a pre-handover inspection in Clyde
Gaps at wall and ceiling mouldings left uncaulked before painting
Mortar smears left on the brickwork around the property, found during a pre-handover inspection in Clyde
Mortar smears left on the brickwork around the property
Owner Inspections building inspectors
Why Clyde owners choose us

Independent. Licensed. Insured.

  • Every Clyde report is written by the inspector who attended, not a call centre.
  • We inspect to AS 4349.1, AS 2870, AS 1684 and the Guide to Standards and Tolerances 2015.
  • Casey is an N2 wind area, so bracing and tie-down get checked against the engineering.
  • You get the inspector's mobile number to talk the findings through with your builder.
Guides

Pre-Handover (PCI) Inspections guides for Clyde

All guides →

Book pre-handover (pci) inspections in Clyde

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-Handover (PCI) Inspections in Clyde: common questions

When should I book a PCI in Clyde?

As soon as your builder gives you a practical completion date, and at least a week before it. That leaves time for us to attend, write the report and for you to send the list before you are asked to sign.

What is not included in a pre-handover inspection?

It is a visual inspection. We do not energise circuits, pressure test plumbing, commission heating or cooling, test appliances or automatic garage door safety systems, and we do not inspect concealed framing, anything below ground or areas blocked by stored goods. Electrical, gas and appliance commissioning are for the licensed trades and the certifier.

Can you come back after the builder fixes the list?

Yes. A reinspection checks each item off the original report and gives you a second written record before settlement, which matters if anything is still outstanding.