
When to book each stage inspection on a Clyde build
The order Clyde trades follow, and the window before each stage is covered.
What our inspectors know about building, buying and owning in Clyde.
One of our inspectors will call you back.
If it is urgent, email [email protected]

The order Clyde trades follow, and the window before each stage is covered.

Bracing, tie-down and plumb, measured against N2 wind loads.

Sarking, flashings and window seals, checked while they can still be seen.

What to have in hand before you sign at practical completion.

The findings that repeat across Clyde pre-handover reports.

Closing out the PCI list before you hand over the balance.

How the tolerances guide settles the argument.

Writing, escalating and the Victorian dispute path.

Why membrane defects are the most expensive thing to find late.

Drainage, roof water and workmanship, not age.

What each scope covers and which one you need.

The five minute version, before you pay for anything.

The barrier, the notice and what goes wrong with both.

The things around a house that invite termites in.

AS 4349.3, honestly explained.

A new Clyde home can pass its handover inspection and still fail the Victorian rental standards. The items builders leave out, and how to close them before the first lease.

Attached homes in Clyde must meet the same 15 Victorian rental standards as houses. Where shared walls, shared bins and owners corporation rules make a difference.

Well sealed new Clyde homes trap moisture. When condensation mould on frames and ceilings fails the Victorian mould and damp standard, and when it does not.
Instant online pricing for Clyde, or contact the booking team.
Start with the stage timing guide, then the frame inspection guide. Those two decide most of what you can influence.
When the standards or the Victorian regulator change, and whenever what we find on site shifts.
Yes. They are written to be readable by both sides.